Sunday, February 22, 2009

End walls -- framing and sheathing

The weather has finally improved and the end walls are framed and sheathed.

Next step, weather permitting, is to install the roofing.






















Posted by Picasa

Sunday, December 21, 2008

Ski season on Kahboo Hill


The temperature was 8 degrees the other morning, not really the best for building, so we've been skiing instead ...































The road and driveway























At the entrance to Kahboo Hill Rd.















Going up .. .











Down is more fun!
Posted by Picasa


Thursday, December 4, 2008

More overhangs



Here's the last of the pine. It will be covered w/ tar paper ASAP, before it rains.

Sunday, November 23, 2008

Predator-in-chief

On the job
Posted by Picasa

Overhangs

Back to work after a month away. The current job is to finish the sub-facia and overhangs , which are being done with 1x6 T&G pine. So far the south-facing roof is done, with the higher north facing roof and loft still to go.
























There will be three skylights above the porch.
The supports are temporary; hopefully we don't get any major snow loads anytime soon.